Liberia Sub station

Liberia Substation was enlargerd in the exit to the new Papagayo Substation. The principal bar was divided in two and a second module was built in “U” configuration with its respective reserve section.

This involved the relocation of the lines that go to Los Brasiles Substation and Cañas Substation. Also we had to relocate a reactor and a transformer with a section of 230 kV and connect it to a power cable towards the Metal Clad.